Video poster

A single E-Gen600 pushing out 100,000kWh

Situation

An ultra-luxury Gold Coast residential tower constructed on a tight deadline and with high power demands that the 63A three-phase mains supply cannot fulfil. The E-Gen600 can.

71,106

L

$200,520 AUD

Diesel saved

100k

kWh

5,112 operational hours

100% uptime

314

A

peaks, up to 70A base.

fed by a 63A mains supply

Video poster
0:00 / 0:00
Overview

Mosaic Property Group’s largest current build — the 41 storey, 60 half and full-floor residence Madeline tower on Queensland’s Gold Coast — required power loads that the 63A mains supply could not deliver.

With 80% of the project already sold, not meeting the required power need would push out the completion deadline and cost the company. That made both output capability and uptime reliability critical factors for Mosaic when choosing a power solution.

They chose to connect the entire site to a single E-Gen600. Situated at the base of the Yongmao STL420A-24t luffing crane, it’s also powering two YHX SC200 high-speed hoists, a Callaghan KB-M33Z5 satellite concrete pump, and the site power.

The unit has output over 100,160kWh to date and maintained continuity across regular base loads up to 70A (49kVA) and peaks up to 314A (218kVA). Over 5,112 hours of operational time the E-Gen600 has delivered 100% uptime, and the project is on-track for the targeted late-2028 completion date.

Project
Madeline
Construction company
Mosaic Property Group
Location
Gold Coast, Queensland, Australia
Project start
January 2026
Site loads

Yongmao STL420A-24t luffing crane
2x YHX SC200 high-speed hoist
Callaghan KB-M33Z5 satellite concrete pump
Site power

Power requirement
600kVA
Input feed
63A three-phase mains supply
Battery system
E-Gen600

E-Gen600 powers the entire site

Situated at the base of the Yongmao STL420A-24t luffing crane, it also powers two YHX SC200 high-speed hoists, a Callaghan KB-M33Z5 satellite concrete pump, and site power.

By the numbers

Powered by a 63A mains supply, the single E-Gen600 on site sustained base loads up to 70A and significantly higher peaks, across the 100,160kWh output.

Output current

5x

Five times higher than a 63A mains supply. Delivered by a E-Gen600.

Uptime

5112 hours up. 0 hours down.

100% uptime with consistently high SoC.

Related case studies

Verified

Field-proven across Australasia. With over 300,000+ operational hours logged, the E-Gen Series has delivered 99.99% uptime across large-scale sites, dense urban construction and remote infrastructure.