16
AAvailable on-site power
Grid connection only
7t
CO₂ reduced
per month
265
kVALoad requirements
Crane + site power
The grid connection was not large enough to support the crane. Instead of taking the traditional approach and installing a 200kVA generator for the crane, Cassidy chose the CP300 and simply plugged it into their existing temporary site power supply, eliminating the need for a generator all together.
Cassidy are saving money, reducing noise and fumes and are preventing 7 tonnes of CO2 emissions each month.
Terex CTL-260