Reducing carbon
by 185,000kg

Situation

Two diesel generators powering tower cranes and personnel hoists in Auckland CBD that cause constant problems with noise, diesel fumes and complaints from neighbours.

Innercity

Site type

Development

185

t

CO₂ reduced

per annum

Overview

To address the noise and emissions problems caused by diesel generators, Watts & Hughes installed a CP300.

The unit was configured to draw only 16A and connected to one of the site power distribution boards, providing power for both the Potain MCR 295 luffing tower crane and the personnel hoist.

The CP300 has helped improve relations with neighboring residents by reducing noise and emissions, and improved productivity and reduced downtime on-site by supplying reliable and efficient power to the on-site equipment.

Operational costs have also reduced by eliminating the need for two diesel generators, which also reduced their carbon footprint by over 185t annually.

Project
Abstract Hotel
Construction company
Watts & Hughes
Location
Auckland, New Zealand
Project start
April 2023
Site loads

Potain MCR 295 luffing tower crane

Power requirement
265kVA crane + site power
Input feed
16A three-phase mains supply
Battery system
CP300