Situation

The original plan for this site was to put a 200kVA generator on each of the three cranes,but SMITH Cranes suggested the site use a single CP300 as a solution to powering all three cranes instead.

100

%

Uptime

Over 12 months

24/7

Power availability required

Including nights and weekends

265

kVA

Load requirements

Crane + site power

Video poster
0:00 / 0:00
Overview

With 32A input feed into the CP300, and an output feed of 440A to a switch board, the CP300 was able to power all three cranes from the distribution board. For over 12 months, the CP300 has powered all three cranes with zero downtime, barely dropping below 70% on the busiest day.

A further benefit of the CP300 over diesel generators was the 24/7 availability of power. The generators are unable to be used during night times or weekends, which would have caused the cranes to lose power during these times, meaning safety lights wouldn’t work.

Project
CDC Data Centre
Construction company
BUILT
Location
Hobsonville, Auckland, New Zealand
Project start
April 2024
Site loads

3x Comansa 21CM1100

Power requirement
432kVA
Input feed
32A three-phase mains supply
Battery system
E-Gen300